Assembly & Maintenance Exercise Refrigeration
Model HV-EXP4528
Technical Description Using, students can develop skills on how to undertake a complex engineering project. The skills developed are the planning, execution and checking of assembly; commissioning, and maintenance operations. The assembly covers installation of the refrigeration components: Installing the low-pressure and high-pressure switches, the expansion valve and the refrigeration circuit piping. The pipe connections are not soldered, but bolted. The electrical installation includes wiring and connecting up all units and switching elements. The tool set is required to assemble the unit. The refrigeration charging and evacuation station is required for commissioning the unit. The fully assembled presents a fully functional temperature-controlled cooling system with cooling chamber and electric thermostat. Repeated assembly and disassembly is possible.The experiment is mounted on a workbench, with drawers to hold components and tools. The assembly panel and refrigeration chamber are mounted on a frame. The frame, condenser set and switch box are permanently bolted to the workbench work surface. The refrigeration and electrical components are attached to the aluminium assembly panel.The fully assembled presents a real, fully functional temperature-controlled cooling system with cooling chamber and electric thermostat. The system is supplied in kit form..